1631 |
Ministry of Housing and Public Works
Rajdhani Unnayan Kartripakkha (RAJUK)
|
ICB-4(G)/2018-19
Procurement of Seismic Lab Equipment for URU (Package No. URP/RAJUK/G-12)
|
Supply of 8 Items: Cyclic Universal Testing Machine (Capacity: 600 kN) (1 No.), Universal Testing Machine (Capacity: 2000 kN) (1 No.), Universal Testing Machine (Capacity: 500 kN) (1 No.), Cyclic Triaxial Test (1 No.), Cross-Hole Seismic Equipment (3 Nos.), Static Triaxial System (2 Nos.), Automatic Consolidation (5 Nos.), Direct and Residual Shear Test Device (5 Nos.)
Delivery, Installation & Setting up: 180 days from the date of Contract Sign
Local level detailed hand-on O&M Training: 12 months from the date of Contract Sign |
Dynamic Solutions |
59/3/1, Purana Paltan (2nd Floor),
Dhaka-1000, Bangladesh |
28/04/2019 |
|
1632 |
Ministry of Housing and Public Works
Rajdhani Unnayan Kartripakkha (RAJUK)
|
ICB-5(G)/2018-19
Procurement of Field Equipment for Vulnerability Assessment Aspect of Structures & Geo-physics (Package No. URP/RAJUK/G-15)
|
Supply of 6 Items: Rebar Scanner (Deeper Depth) (10 Nos.), Rebar Scanner (Shallow Depth) (20 Nos.), Ground Penetrating RADAR (2 Nos.), Electrical Resistivity (2 Nos.), Ultra Pulse Velocity Machine (10 Nos.), Core Cutting Machine (10 Nos.)
Delivery, Installation & Setting up: 180 days from the date of Contract Sign
Local level detailed hand-on O&M Training: 12 months from the date of Contract Sign |
M/s. Sarker Kabir Ahamed |
31 Bir Uttam K.M. Shafiullah Road,
Dhaka-1205, Bangladesh |
28/04/2019 |
|
1633 |
Ministry of Shipping
Mongla Port Authority
|
18.14.0158.427.00.391.17-161; Date: 23 April 2019
Notification Award for Maintain the Navigability of Pussur Channel by Operating MPA’s Own Dredger
|
Notification Award for Maintain the Navigability of Pussur Channel by Operating MPA’s Own Dredger |
AZ Dredging Ltd |
Suite 16-C, Rupayan Karim Tower, 80, Kakrail, Dhaka |
25/04/2019 |
|
1634 |
Ministry of Science and Technology
Bangladesh Council of Scientific and Industrial Research (BCSIR)
|
5600.8400.05.007.2019/NoA-06
Construction of 01(one) Basement + 07(seven) Storied Laboratory Building with 07(seven) Storied Foundation at Dhanmondi Campus of BCSIR, Dhanmondi, Dhaka.
|
Construction of 01(one) Basement + 07(seven) Storied Laboratory Building with 07(seven) Storied Foundation at Dhanmondi Campus of BCSIR, Dhanmondi, Dhaka. |
Mukta Construction Ltd.-Benfix Steel Building Development Ltd. JV (MCL-BSBDL JV) |
House-1289, Road-11, Avenue-2, Mirpur DOHS, Dhaka
|
03/04/2019 |
|
1635 |
Ministry of Science and Technology
Bangladesh Council of Scientific and Industrial Research (BCSIR)
|
39.345.2672.00.07.5001.18/764, 39.345.2672.00.07.5001.18/765, 39.345.2672.00.07.5001.18/766
Supply of Goods and related Services
|
Guest chair, Laboratory chair, Laboratory tool, Sofa set with tea table, Shelf, File cabinet, Conference table with 30 chair and General table, Digital Thickness Meter, Seam Durability Tester, Crokmeter, Digital Softness Tester, Color Assessment Cabinet, Perspiremeter & Accessories and Oven, Digital Moisture Analyzer, Analytical Grinder, Micro Pipette, Vortex Mixture, Water De-ionized Plant, Analytical Sieves, Nitrogen Can, Deep Freeze, Refrigerator, Vacuum dryer, Ultrasonic Bath, Digital Water Bath, Colorimeter and Vacuum Pump & Accessories. |
Hatil Complex Ltd, Overseas Marketing Corporation (Pvt.) Ltd, Transcom Distribution Co. Ltd. |
Hatil Complex Ltd
8 Shewarapara
Rokeya Sharani, Mirpur
Dhaka-1216, Bangladesh.
Overseas Marketing Corporation (Pvt.) Ltd.
Unique Trade Center (UTC)
Level-15, 8 Panthapath, Dhaka-1215.
Transcom Distribution Co. Ltd.
52, Motijheel C/A, Dhaka-1000.
|
14/03/2019 |
|
1636 |
Ministry of Water Resources
Bangladesh Water Development Board (BWDB)
|
CEIP/S10A/4013 dated 06-12-2018
Procurement of Senior Environmental Specialist
|
To provide supports to PMU, CEIP-1, BWDB, in respect to ensure environmental safeguards compliance issues of the project under the World Bank Environmental Safeguards Operational Policies and performing other related tasks as per WB's requirements |
Mr. Md. Amir Faisal |
19-A/18/1, Block-F, Mohammadpur,
Dhaka-1207, Bangladesh
|
11/03/2019 |
|
1637 |
Ministry of Information
Bangladesh Television
|
Automation/consulting firm/2018-19/98
Appointment of a Professional Consulting Firm for Modernization, Digitalization & Automation of Bangladesh Television Central System According To Terms of Reference
|
Appointment of a Professional Consulting Firm for Modernization, Digitalization & Automation of Bangladesh Television Central System According To Terms of Reference |
Yachiyo Engineering Co., Ltd. |
5-20-8, Asakusabashi, Taito-Ku, Tokyo, 111-8648, Japan. |
07/03/2019 |
|
1638 |
Ministry of Water Resources
Bangladesh Water Development Board (BWDB)
|
CEIP-1/S1-A/ 205 Dated 17-02-2019
Non-Governmental Organization (NGO) Services to implement (a) Social Mobilization with Social Action Plan (incl. setting up WMOs); (b) Social afforestation and (c) Integrated Pest Management (IPM) Plan” for Polder No.32 and Polder No.33
|
The objective of the consulting services are to manage and oversee tasks for social mobilization, participatory scheme cycle management(PSM) and participatory afforestation in relation to the successful implementation of the CEIP-I. Specifically, consulting services was sought for (a) Social mobilization including setting up WMOs for introduction of IWRM practices through preparation and implementation of Social Action plan through engagement of local communities and community groups for PSM and participatory O&M of schemes, (b) Implementation of afforestation program in the fore-shore areas with ecologically appropriate species by adopting social afforestation approach and in Embankment Slope , and (c) Implementation of the Integrated Pest Management (IPM ) practices , for Polder No.32 and Polder No.33 in Khulna District under Coastal Embankment Improvement Project, Phase-1 ( CEIP-1 ) |
Centre For Natural Resource Studies (CNRS) |
House No.23, Road No.154, Central Block, Housing Estate, Khalishpur,
Khulna, Bangladesh
|
17/02/2019 |
|
1639 |
Ministry of Water Resources
Bangladesh Water Development Board (BWDB)
|
CEIP-1/S1-B/206 Dated 17-02-2019
Non-Governmental Organization (NGO) Services to implement (a) Social Mobilization with Social Action Plan (incl. setting up WMOs); (b) Social afforestation and (c) Integrated Pest Management (IPM) Plan for Polder No.35/1 and Polder No.35/3
|
The objective of the consulting services are to manage and oversee tasks for social mobilization, participatory scheme cycle management(PSM) and participatory afforestation in relation to the successful implementation of the CEIP-I. Specifically, consulting services was sought for (a) Social mobilization including setting up WMOs for introduction of IWRM practices through preparation and implementation of Social Action plan through engagement of local communities and community groups for PSM and participatory O&M of schemes, (b) Implementation of afforestation program in the fore-shore areas and Embankment Slope with ecologically appropriate species by adopting social afforestation approach, and (c) Implementation of the IPM practices, for Polder No.35/1 and Polder No.35/3 in Bagerhat District under Coastal Embankment Improvement Project, Phase-1, ( CEIP-1 ) |
Shushilan |
House No.614, Road No.12, Baitul Aman Housing Society, Adabar
Dhaka, Bangladesh
|
17/02/2019 |
|
1640 |
Ministry of Water Resources
Bangladesh Water Development Board (BWDB)
|
CEIP-1/S1-C/207 Dated: 17-02-2019
Non-Governmental Organization (NGO) Services to implement (a) Social Mobilization with Social Action Plan (incl. setting up WMOs); (b) Social afforestation and (c) Integrated Pest Management (IPM) Plan, for Polder No.39/2C in Pirojpur District
|
The objective of the consulting services are to manage and oversee tasks for social mobilization, participatory scheme cycle management(PSM) and participatory afforestation in relation to the successful implementation of the CEIP-I. Specifically, consulting services was sought for (a) Social mobilization including setting up WMOs for introduction of IWRM practices through preparation and implementation of Social Action plan through engagement of local communities and community groups for PSM and participatory O&M of schemes, (b) Implementation of afforestation program specially in the fore-shore areas and Embankment Slope with ecologically appropriate species by adopting social afforestation approach, and (c) Implementation of the IPM practices for Polder No.39/2C in Pirojpur District under Coastal Embankment Improvement Project, Phase-1, (CEIP-1) |
JV of RIC ( Resources Integration Centre) and Swabalambi Samaj Unnayan Sangstha (SSUS) |
House # 20, Road No.11 (New), 32 (Old), Dhanmondi R/A,
Dhaka, Bangladesh
|
17/02/2019 |
|