Invitation for Request for Expressions of Interest Status:Approved
GOVERNMENT OF THE PEOPLE'S REPUBLIC OF BANGLADESH
Ministry/Division |
: |
Ministry of Local Government, Rural Development and Co-operatives |
Agency |
: |
Local Government Engineering Department (LGED) |
Procuring Entity Name |
: |
Project Director, Construction of Important Bridges on Rural Roads (Phase-II) Project |
Procuring Entity Code |
: |
|
Procuring Entity District |
: |
Dhaka |
Expression of Interest for Selection of |
: |
Individual Consultant (National) (Time-Based) |
Title Of Service |
: |
River Training Engineer |
EOI Ref. No. |
: |
46.02.0000.655.11.001.22-749 |
Date |
: |
20/11/2023 |
KEY INFORMATION
|
Procurement Sub-Method |
: |
Selection of Individual Consultants (SIC) |
FUNDING INFORMATION
|
Budget and Source of Funds |
: |
Development Budget GOB |
Development Partners |
: |
|
PARTICULAR INFORMATION
|
Project/Programme Name |
: |
|
EOI Closing Date and Time |
: |
19/12/2023 3.00 pm
|
Publication Date |
: |
22/11/2023
|
INFORMATION FOR APPLICANT
|
Brief Description of Assignment |
: |
(a) Review the Hydro-morphological reports and assist LGED in providing physical lay-out of bridge construction work as per the recommendation of hydro-morphological study report and considering climate change scenario of 2050.
(b) For small bridge (Bridge Length<100m), assist LGED in collecting hydro-morphological information of river reaches where the bridge would be constructed, bridge location, finalizing bridge height & length, decide of number of spans of bridge, scour depth, exact location of bank revetment work, preparation of design and cost estimate of RTW.
(c) For Large bridge (bridge length >100m and hydro-morphological study has already conducted). Review the hydro-morphological study report with the prevailing field condition during bridge construction period, review the physical lay-out, location and length of bridge. In case situation changes then as consultation with LGED re-design/modify the design of RTW and lay-out of bridge construction works and calculate the scour depth for pile construction work.
(d) Check the digital topographical survey (Bathymetric survey) of river reaches where the bridge would be constructed, prepare the design, Technical specification and cost estimate of RTW.
(e) Provide and layout of river training works with Global GPS (RTK) co-ordinates.
(f) Supervise the construction works of RTW and report on the findings.
(g) Provide technical support to Project Director for implementation of RTW.
|
Experience, Resources and Delivery Capacity Required |
: |
15(fifteen) years of overall experiences, out of which 05(Five) years relevant experience in designing and supervision of river training work (RTW) of bridge projects. (Detailed in ToR). |
Other Details (if applicable) |
: |
|
Association with foreign firms is |
: |
Not Applicable |
Eoi Detail Information |
Ref No |
Phasing Of Services |
Location |
Start Date |
Completion Date |
CIB2-06/2023-24 |
Time Based |
Dhaka |
February’ 24 |
June'27 |
|
PROCURING ENTITY DETAILS
|
Name of Official Inviting EOI |
: |
Sk. Md. Abu Zakir Sekander |
Designation of Official Inviting EOI |
: |
Project Director |
Address of Official Inviting EOI |
: |
LGED, RDEC Bhaban (Level-10), Agargaon, Sher-e-Bangla Nagar, Dhaka-1207. |
Contact details of Official Inviting EOI |
: |
Phone : 01712443413, Fax : , Email : |
The procuring entity reserves the right to accept or reject all tenders |