3131 |
Maintenance dredging at the inner side of 400 meter jetty and adjacent area at Sadarghat by using Grab dredger/ Excavator/ Backhoe dredger including Excavation and Disposal works.
18.13.0000.732.26.053.22-W-04 (2022-2023)
|
Chief Hydrographer |
29/12/2022 |
24/01/2023
12:30 PM
|
Chattogram |
3132 |
Outsourcing Manpower Recruite
CS/Rang/Outsource recrut/2022-23/3207
|
Civil Surgeon Office, Rangpur |
26/12/2022 |
16/01/2023
12:00 PM
|
Rangpur |
3133 |
Emergency Maintenance of Dumuria UP Office – Tungipara HQ Road from Ch. 3100-5400m. Under Tungipara Upazila
46.02.0000.202.14.031.22-2788
|
Executive Engineer |
26/12/2022 |
16/01/2023
12:00 PM
|
Gopalganj |
3134 |
Emergency Maintenance of Kandi UPC – Talpukuria Bazar via Gojalia Road from Ch. 0.00-710m. Under Kotalipara
46.02.0000.202.14.031.22-2788
|
Executive Engineer |
26/12/2022 |
16/01/2023
12:00 PM
|
Gopalganj |
3135 |
Proposed Modern Training Complex at Bangladesh Institute of Management (BIM), Dhaka Under the Project of Strengthening of BIM (Sub-Head: Supply, Installation, Testing & Commissioning of Computer Networking with Wireless (Wi-Fi) & wired system in/c Data Center)(WD-8)
pwemw/BIM/WiFi
|
PWD EM Workshop Division |
01/01/2023 |
23/01/2023
12:00 PM
|
Dhaka |
3136 |
Package No-1 (a) Detail Estimate for Construction of Gate & Boundary Wall, (b) Detail Estimate for Construction of HBB Road, (c) Detail Estimate for Construction of Sun Drying Floor, (d) Detail Estimates for Construction of One Storied Grain Storage Building. Buying & Selling Centre & Toilet Blocks, (e) Detail Estimates for Construction of Office Cum Garage, (f) Site Development of Agribusiness Centre area. (g) Supply of computer & related items, (h) Documentation work, (i) Provisinal Sum work of Bara Chhara Sub-Project (SP ID:34124) Under Upazila: Nabiganj, District: Habiganj
Package No.2 (a) Construction of Bara Chhara WRS (3V-2.0m x 2.5m) at Ch. 2+350km (Baro Chara), (b) Construction of Box Culvert (3V-3.0m x 3.5m) at Ch. 4+050 km on Bara Chhara Khal, (c) Construction of Box Culvert (1V-4.0m x 3.0m) at Ch. 2+162 km on Bara Chhara L/B embankment. (d) Construction of Outlet-5 IV-300m at Ch. 5+061 km on Bara Chhara Khal R/B Connection with drain-5, (e) Construction of Irrigation Canal (5 nos) Drain 1,2,3,4=250m each and Drain-5=200m (Total Length=1200m) size width=0.5 m & Height=1.0mm-at Ch. 3+584 km (R/B), Ch.3+588km (L/B), Ch.4+070 km (R/B), Ch. 4+040 (L/B) &. Ch. 5+061 Km (R/B) of Bara Chhara Khal, (f) Construction of Outlet-6 (1V- 300mm) at Ch. 2+450 km on R/B Bara Chhara Khal, (g) Construction of Outlet- 7 at (1V -300mm) Ch. 2+400 km on L/B of Bara Chhara Khal,(h) Documentation work of Sub-Project (SP ID- 34124) Under Upazila: Nabiganj, District: Habiganj
Package No-3 (a) Construction of HBB road from near union Parishad to Raisganj Bazar of Bara Chhara, (b) Documentation work of Sub-Project (SP ID-34124) Under Upazila: Nabiganj. District: Habiganj.
Memo No.46.02.3600.000.07.001.22-2488
|
Executive Engineer |
27/12/2022 |
23/01/2023
01:00 PM
|
Habiganj |
3137 |
18.16.0000.373.79.002.22 COMC 004
|
BANGLADESH SHIPPING CORPORATION (BSC) |
29/12/2022 |
10/01/2023
12:30 PM
|
Chattogram |
3138 |
Different b & R Works of Bangladesh army for the financial year 2022-2023
42 of 2022-2023/E
|
DW & CE (Army) Dhaka Cantt. |
06/12/2022 |
09/01/2023
12:00 PM
|
Dhaka |
3139 |
18.16.0000.373.02.160.22/ COMC-06122022
|
Bangladesh Agriculture Development Corporation (BADC) |
29/12/2022 |
11/01/2023
12:15 PM
|
Dhaka |
3140 |
SE/TANGL/107 Date-23.08.22
|
Executive Engineer, PWD Division, Jamalpur |
01/01/2023 |
16/01/2023
12:30 PM
|
Jamalpur |