2821 |
Supply of New Vehicle (Double Cabin Pickup) (Rent) for Improvement of Cumilla (Mainamati)-Brahmanbaria (Dharkhar) National Highway as 4-Lane National Highway.
35.01.0000.075.07.002.2022-189
|
Project Director (ACE, RHD) Improvement of Cumilla (Mainamati)-Brahmanbaria (Dharkhar) National Highway as 4-Lane National Highway Project. |
13/07/2023 |
02/08/2023
12:00 PM
|
Dhaka |
2822 |
Construction of 7 Storied (24 Units apartment) Beanibazar Pourashava Cleaners Residential Building including internal electrical works, lift & external electrical connection , electro-mechanical work, sanitary and water supply, earth work, internal road, drainage, boundary wall etc under Upazila: Beanibazar, District: Sylhet.
46.02.9100.000.14.169.23-2230
|
Executive Engineer, LGED, Sylhet |
10/07/2023 |
13/07/2023
02:00 PM
|
Sylhet |
2823 |
1. Improvement of Garidaha UP-Shibpur bazar at Ch. 458-1518m under Sherpur Upazila, District-Bogura [Road ID # 110883019]. 2. Improvement of khanpur UP-Chalkdhali ghat-Bhubanganti hat road at Ch. 2300-3300m under Sherpur Upazlla, District-Bogura [Road ID # 110883022]. 3. Improvement of Ghogahat (NHW)-Bishwa hat-Atail-Bhabanipur UP road at Ch. 7680-8680m with 3 nos. U-drain 625mmX600mm under Sherpur Upazila, District-Bogura [Road ID # 110883027]. 4. a) Improvement of Foot Village NHW-Chalkpharia Hat Road Ch.1000-2000m. [Road ID No-110884023] (b) Construction of 2-Nos U-Drain 0.625mX0.600m at Ch: 1100m & 1680m under Sherpur Upazila, District: Bogura. [Total Cost of Salvage Materials Tk. 4,23,081.00]. & 5. a) Improvement of Khamerkandi UP-Ghordour Hat-Perphabanipur-Amrul UP Road Ch. 7500-8500m. [Road ID No-110883010] (b) Construction of 1-No RCC Box Culvert 4.00mX 3.00m at Ch: 8483m. (c) Construction of 2-Nos U-Drain 0.625mX0.600m at Ch: 7588m & 8102m under Sherpur Upazila, District: Bogura. [Total Cost of Salvage Materials Tk. 4,96,700.00].
1. APP ID # 189084 & 2. APP ID #187736
|
Md. Golam Morshed, Executive Engineer, LGED, Nishindra, Bogura. |
|
27/07/2023
01:00 PM
|
Bogura |
2824 |
1. Improvement of Bishalpur UP-Pachulhat (UZR)-road via Manikchapur road at Ch. 00-2340m with 7 nos. U-draln 625mmX600mm under Sherpur Upazila, District-Bogura [Road ID # 110883021]. [Total Cost of Salvage Materials Tk. 4,84,505.00]. & 2. a) Improvement of Bamonpara Pucca road-Hukmapur road via Dhalmohoni GPS road at Ch. 00m-2700m [Road ID No-110205061] b) Construction of 0.625mx0.600m 06-Nos culvert at Ch. 627m, 700m, 1086m, 1162m, 2255m & 2585m under Bogura Sadar Upazila, District: Bogura. [Total Cost of Salvage Materials Tk. 8,60,779.00].
1. APP ID # 189084 & 2. APP ID #187736
|
Md. Golam Morshed, Executive Engineer, LGED, Nishindra, Bogura. |
|
03/08/2023
01:00 PM
|
Bogura |
2825 |
Establishment of 560 model Mosque and Islamic Cultural Centers in each Zila & Upazila of Bangladesh (2nd Revised)
Dimla mosque/Nilphamari/W-6/1/2023-24
|
Executive Engineer, PWD division, Nilphamari. |
13/07/2023 |
14/08/2023
11:00 AM
|
Nilphamari |
2826 |
Notice for time charter employment of M.T. Banglar Agragoti (IMO NUMBER: 9793870) open at Malaysia-Philippines range with lay- can 25-31 July, 2023 subject to readiness of the ship.
18.16.0000.373.61.002.23/ COMC-02072023
|
Bangladesh Shipping Corporation (BSC) |
11/07/2023 |
19/07/2023
12:30 PM
|
Chattogram |
2827 |
Packing, Sewing, Placement on Conveyor Belt and Staking of 50 (fifty) Kg Urea Fertilizer inserted inside Jute/ WPP Bag. Polyethylene Bag inserted inside Jute/ WPP Bag.Packing, Sewing, Placement on Conveyor Belt and Staking of 50 (fifty) Kg Urea Fertilizer inserted inside Jute/ WPP Bag. Polyethylene Bag inserted inside Jute/ WPP Bag.
GPFPLC/Operation/2023-2024/21
|
Ghorashal Polash Fertilizer PLC/ BCIC |
10/07/2023 |
26/07/2023
11:00 AM
|
Narsingdi |
2828 |
Construction of AIS-GIS Third Underground Interconnection Line(AIS Substation of Ghorashal Power Station, BPDB to GIS Switching Station, PGCB) using Max Power Bay (at AIS) and Unit 07 Bay(at GIS)
27.21.0000.447.07.001.23.145
|
Mohammad Mynul Islam, Executive Engineer, Grid Maintenance Division, Narsingdi |
04/07/2023 |
31/07/2023
04:00 PM
|
Narsingdi |
2829 |
Construction of 3 Storied District Office Cum training centre with 4 storied Foundation at Kushtia District under the Project Enhancement Agricultural Marketing Department (Including, Civil, internal and external water supply & sanitary works, internal & external Electrification Boundary wall, Road work, etc with necessary ancillary works) Fy 2022- 23
ACE PWD Khulna Zone vide Memo No-358. Date-01.06.2
|
Kushtia Public Works Division |
01/06/2023 |
07/08/2023
12:30 PM
|
Kushtia |
2830 |
D-38: Construction of RCC Drain from joybangla road Akkas Market to jiraytoli Box Culvert
46.19.0000.018.07.001.23-2988
|
Mayor, Gazipur city corporation. |
09/07/2023 |
08/08/2023
02:00 PM
|
Gazipur |