11 |
New Construction & Side Widening of Flexible Pavement From Ch. 39+215Km to 47+220Km, 02 Nos Bus-Bay and Construction of 03 Nos R.C.C Box Culvert at Gap No-40/1, 41/1, 42/1 & 04 Nos R.C.C Box Culvert Extension and 01 Nos 44.02m PC Girder Bridge with Others incidental work and Protective work of Shariatpur-(Monohar Bazar)-Ibrahimpur Ferry Ghat Road (R-860) under Shariatpur Road Division, during the year 2023-2024.(WP-03).
e-GP-03/EE/SRD/2024-2025 Development WP-03.
|
Executive Engineer, Road Division, Shariatpur |
30/06/2025 |
15/07/2025
01:00 PM
|
Shariatpur |
12 |
Long-Term Lease for Operation and Maintenance of Service Area-2 Facilities, Developed in Connection with the Padma Bridge at Janjira, Shariatpur, Bangladesh.
50.01.0000.000.105.34.0001.21
|
Director (Admin), BBA, Dhaka |
29/06/2025 |
27/07/2025
01:00 PM
|
Dhaka |
13 |
Carrying, unloading and stacking at a height of 30-32 sacks of 50,008 MT (Approx) bagged TSP to 16 Buffer/ Factory Godowns in different regions of the country by truck.
36.01.1565.674.00.079.2025(Private fertilizer carrying)/515
|
TSP Complex Ltd., North Patenga, Chattogram. |
29/06/2025 |
29/07/2025
11:00 AM
|
Chattogram |
14 |
Periodic Maintenance Programme Providing with DBSWC at Ch. 12+000 to 13+700, Ch. 14+200 to Ch. 20+050, Ch. 25+100 to Ch. 26+100, Ch. 34+500 to Ch. 35+137, Ch. 39+000 to 43+000, Ch. 43+000 to Ch. 46+450, Sign-Signal, km Post etc. of Mirpur - Sreemongal - Moulvibazar - Sherpur (N-207) Road under Road Division, Moulvibazar during the year 2024-2025
35.01.5800.446.07.002.25-1120
|
Moulvibazar Road Division |
26/06/2025 |
16/07/2025
12:00 PM
|
Moulvibazar |
15 |
Procurement of HMI Upgradation of Control System along with Intergration and Retrofitting of Instrument Air Compressor Control System in DCS of Shikalbaha 225 MW CCPP, BPDB, Chattogram, Bangladesh
27.11.0000.304.25.338.25
|
Director, Directorate of Purchase, BPDB, Dhaka, Bangladesh |
26/06/2025 |
13/08/2025
11:00 AM
|
Dhaka |
16 |
27.87.0000.000.106.37.0013.24.468
|
Superintending Engineer, Contract & Procurement Circle, Dhaka Power Distribution Company Limited (DPDC) |
29/06/2025 |
30/07/2025
11:00 AM
|
Dhaka |
17 |
Construction of Distribution Pipe Network with DMA Establishment Including Service connection with Meter and Construction Works for Modification of 63 DMA in Existing KWASA Area with 2 years of Operation and Maintenance.
46.07.0000.001.33.001.25-7030
|
Managing Director, Khulna WASA. |
30/06/2025 |
21/08/2025
03:00 PM
|
Khulna |
18 |
Construction of 2nd Floor,3rd Floor,4th Floor,5th Floor and Chila kota in/c Civil Sanitary and Electrification works At Lama bazar Police outpost, Kotuwali Model thana of SMP Sylhet. Fy 2024-2025.
ACP/Syl/PWD/2024-2025/SD1/802(2)
|
Executive Engineer Sylhet PWD Division, Sylhet |
|
24/07/2025
02:00 PM
|
Sylhet |
19 |
ACE/PWD/Syl/NSI/2024-2025/726(2)
|
Executive Engineer Sylhet PWD Division, Sylhet |
|
10/07/2025
11:00 AM
|
Sylhet |
20 |
Construction of 3rd and 4th Floor (Vertical Extension) of NSI Building, Sylhet.
ACE/PWD/Syl/NSI/2024-2025/726(2)
|
Executive Engineer Sylhet PWD Division, Sylhet |
|
10/07/2025
11:00 AM
|
Sylhet |