1121 |
A Consulting Firm (National) for the-
(i) Item-1: Design, Development, Testing, Implementation and Maintenance of an Android Based AFC Bus Validator System along with necessary system integration with Clearing House of DTCA;
(ii)Item-2: Design, Development, Testing, Implementation and Maintenance of an Android-Based TOM System for Handy POS device along with necessary system integration with Clearing House of DTCA.
35.02.0000.008.35.043.22-302
|
Project Director, Establishment of Clearing House for Integrating Transport Ticketing System in Dhaka City and Adjacent Districts (Phase-II) Project |
25/06/2023 |
23/07/2023
12.00 PM
|
Dhaka |
1122 |
Selection of Consulting Firm for Assessment of Aquatic Resources of the Sundarbans.
22.01.0000.461.29.005.23-2181
|
Divisional Forest Officer, Sundarban West Forest Division, Khulna |
25/06/2023 |
13/07/2023
12:00 pm
|
Khulna |
1123 |
Operation and Management (O&M) of Toll Collection System including upgradation/Migration of existing Toll Collection System and weigh scales system with real time web based on-line centralized toll collection system, ETC Fast Track Toll Lane and related services of “Chhatak Bridge Toll Plaza” at 13th KM of Gobindagonj-Chhatak-Doarabazar Road (Z-2802) under Sunamganj Road Division of Road Circle, Sylhet for 2(Two) years
03/EOI/SE/SRC/2022-2023.(Re-EOI)
|
Utpal Samanta |
22/06/2023 |
19/07/2023
12:30 PM
|
Sylhet |
1124 |
Operation and Management (O&M) of Toll Collection System including upgradation/Migration of existing Toll Collection System and weigh scales system with real time web based on-line centralized toll collection system, ETC Fast Track Toll Lane and related services of “Ranigonj Bridge Toll Plaza” at 31st KM of Pagla-Jagonnathpur-Ranigonj-Aushkandi Road (R-241) under Sunamganj Road Division of Road Circle, Sylhet for 2(Two) years.
04/EOI/SE/SRC/2022-2023 (Re-EOI)
|
Superintending Engineer, RHD, Sylhet Road Circle, Sylhet. |
22/06/2023 |
19/07/2023
01:00 PM
|
Sylhet |
1125 |
Request for Expression of Interest (REOI) for Training Specialist (TS).
53.03.0000.090.33.002.22-507
|
Additional Secretary, Insurance Development and Regulatory Authority (IDRA), Dhaka |
21/06/2023 |
13/07/2023
4.00 pm
|
Dhaka |
1126 |
Feasibility study on Proposed “Establishment of Sheikh Hasina Textile Engineering College, Sreepur, Gazipur” project
24.02.0000.408.07.019.23-08
|
Project Director, “Feasibility Study on 3 Textile Engineering Colleges” |
21/06/2023 |
04/07/2023
12.00 pm
|
Dhaka |
1127 |
Feasibility study on Proposed “Establishment of Sayed Ashraful Islam Textile Engineering College, Kishoreganj” project
24.02.0000.408.07.019.25-10
|
Project Director, “Feasibility Study on 3 Textile Engineering Colleges” project |
21/06/2023 |
04/07/2023
12.00 pm
|
Dhaka |
1128 |
Feasibility study on Proposed “Establishment of Bir Protik Gazi Textile Engineering College, Rupganj” project
24.02.0000.408.07.019.24-09
|
Project Director, “Feasibility Study on 3 Textile Engineering Colleges” |
21/06/2023 |
04/07/2023
12.00 pm
|
Dhaka |
1129 |
Selection of Individual Consultant (Network Security)
14.33.0000.316.14.049.23
|
Establishing External Telecommunnication Network for Rooppur Nuclear Power Plant |
20/06/2023 |
30/07/2023
12:00 PM
|
Dhaka |
1130 |
Consultancy Services for Feasibility and Details Technical Design for second phase of BWCSRP.
WCS/C-24/8160
|
Project Director, BWCSRP Component-B; SHEWS, BWDB, Dhaka |
20/06/2023 |
13/07/2023
3:30 PM
|
Dhaka |