Ministry/Division |
: |
Ministry of Railways |
Agency |
: |
Bangladesh Railway |
Procuring Entity Name |
: |
Project Director |
Procuring Entity Code |
: |
224378500 |
Procuring Entity District |
: |
Dhaka |
Expression of Interest for Selection of |
: |
Consulting Firm (International) (Lump-Sump) |
Title Of Service |
: |
Engagement of Consulting firms for Basic Design, Estimation & Supervision for Signaling & Interlocking system, related track works and other works of 20 (Twenty) stations with provision of CTC system for western zone of Bangladesh Railway. |
EOI Ref. No. |
: |
54.01.0000.678.01.002.18-339 |
Date |
: |
19/12/2023 |
KEY INFORMATION
|
Procurement Sub-Method |
: |
Quality and Cost Based Selection(QCBS) |
FUNDING INFORMATION
|
Budget and Source of Funds |
: |
Development Budget Loan |
Development Partners |
: |
EDCF (Economic Development Cooperation Fund ) through EXIM Bank of Korea |
PARTICULAR INFORMATION
|
Project/Programme Name |
: |
“Replacement and Modernization of Signalling and Interlocking System of Station of Ishurdi-Parbatipur Section in West Zone of Bangladesh Railway” |
EOI Closing Date and Time |
: |
17/01/2024 12:00
|
Publication Date |
: |
18/12/2023
|
INFORMATION FOR APPLICANT
|
Brief Description of Assignment |
: |
Ishurdhi-Parbatipur corridor is one of the most important corridors of Bangladesh Railway having used as main line (Dual Gauge Single line section) of west zone of Bangladesh Railway connecting the major district of Bangladesh. There are different classes of 24 stations and 20 (Twenty) nos. of block stations in Ishurdhi-Parbatipur section. The existing signaling system of the 20 (Twenty) block station are very old and worn out mechanical system. Therefore, the Government of People’s Republic of Bangladesh decided to replace the existing signalling system of 20 stations by modern Computer Based Interlocking Signalling System (CBI) with the assistance of EXIM Bank of Korea through EDCF.
The Government of the People’s Republic of Bangladesh (GoB), through Bangladesh Railway (BR or the Employer) of Ministry of Railways, intends to engage consultants for Basic Design, Estimation & Design review and Construction Supervision works for introducing CBI Based Signaling & Interlocking system with provision of CTC system and related track works and other co related works including defects liability period of the mentioned section. Consultancy Services will be as per Terms of Reference (TOR).
The assignment of the consulting firm is maximum 36 Months and categorized in two phases as Lump Sum:
? Phase -I : Prepare the basic design and technical specification for the specified works and for preparation of bidding documents
? Phase-II: Design Review, Construction Supervision, Testing and Commissioning of Signaling & Interlocking system with provision of CTC system including defects liability period. |
Experience, Resources and Delivery Capacity Required |
: |
a) The Consulting firm shall have satisfactory working experience(s) comprising of conducting similar works e.g. preparing bidding documents including technical specification, Signal Plan / Drawings for CBI signaling and interlocking system including CTC. The consulting firms shall also have experience in Carrying out Construction Supervision and testing Services during construction of signaling system and other related works.
b) The consulting firms shall have adequate number of human resources with experience relevant to the assignment. For more information please visit www.railway.gov.bd (Notice menu) |
Other Details (if applicable) |
: |
? The Consultant firm will be selected in accordance with the Quality- Cost Based Selection (QCBS) Method as per the ”Guideline for the Employment of Consultants under EDCF Loan” .
? Expression of Interests (EOI) in three sets (One original + Two duplicate) and searchable format soft copy shall be submitted in sealed envelope and delivered to the address of the undersigned.
Association with foreign firm(s): Association in the form of JVCA or Sub-consultancy with qualified firm/firms within Korean consulting firms as per provision in the ”Guideline for the Employment of Consultants under EDCF Loan” will be allowed. The formation, operation and obligation of JVCA shall be governed by the Rules-54 of PPR, 2008 as enforced in Bangladesh. |
Association with foreign firms is |
: |
Not Applicable |
Eoi Detail Information |
Ref No |
Phasing Of Services |
Location |
Start Date |
Completion Date |
54.01.0000.678.01.002.18-339 |
Phase I Prepare the basic design and technical specification for the specified works and for preparation of bidding documents |
Project Site |
01 May 2024 |
30 October 2024 |
54.01.0000.678.01.002.18-339 |
Phase II Design Review, Construction Supervision, Testing and Commissioning of Signaling & Interlocking system with provision of CTC system including defects liability period. |
Project Site |
01 January 2025 |
30 June 2027 |
|
PROCURING ENTITY DETAILS
|
Name of Official Inviting EOI |
: |
SYED MD SHAEEDUZZAMAN |
Designation of Official Inviting EOI |
: |
Additional Chief Signal & Telecommunication Engineer & Project Director, Bangladesh Railway |
Address of Official Inviting EOI |
: |
Room No. 608, 5th Floor, Railbhaban, 16 Abdul Gani Road, Dhaka-1000 |
Contact details of Official Inviting EOI |
: |
Phone : +8801709999093/+8801711506145, Fax : , Email : brsha25@gmail.com/pdsig@railway.gov.bd |
The procuring entity reserves the right to accept or reject all tenders |